No position: holding 965 IDR needs a 26.1% EBIT margin (above every year on record) or a discount rate near 9.1%, while margins are falling and the data-centre link rests on one profile word and a three-year-old 30 MW campus.
Base case: Underweight
Thesis
The market may be paying for growth that POWR's returns cannot turn into value. Return on invested capital is 10.16%, just under the assumed cost of capital, so at that rate extra megawatts sold on today's estate economics add almost nothing: lifting revenue growth from 0.18% to 5% a year moves the DCF by about IDR 3 a share. Value rises only if new load earns more, which means the hyperscaler-tariff contract this data cannot show: no tariff, no contracted megawatts, and one counterparty on record, a 30 MW campus first supplied three years ago (scout record, not re-verified).
Scarcity does not rescue it. The repo's 2026-10-03 scout record reports PLN carrying a 6 GW surplus and the Jatiluhur build halted over water and permits, not power. If so, the scarce asset is a permitted site with water, not electrons, and POWR sells electrons.
The reported numbers run the other way: holding today's price needs a 26.1% terminal EBIT margin, above every year on record.
Hypothetical position: 0% of a $100M fund, an analytical exercise.
What's Priced In
The price pays for either a 26.1% terminal EBIT margin (the best reported year was 25.33%) or a WACC near 9.1%. This thesis believes neither: margins have lost 4.29pp since the 2023 peak, and press-reported distributions of $68.2M (98.1% of TTM net income, assuming both payments belong to FY2025) exceed TTM free cash flow by $18.2M. It also believes the data-centre story is unconfirmed: 0 of 1 wire items has the other side naming POWR.
What breaks it fastest: FY2026 EBIT margin at or above 25.3% at the FY2026 results (expected Q1 2027, inferred; no date in the data). An earlier tell is gross margin back at FY2024's 47.14%, against 44.3% TTM, at the Q3 2026 print.
The Numbers
| Trailing metric | POWR | PGEO | BREN |
|---|---|---|---|
| Statement / quote currency | USD / IDR | USD / IDR | USD / IDR |
| Revenue (TTM) | $556.94M | $462.90M | $639.55M |
| Net income (TTM) | $69.55M | $148.36M | $153.88M |
| Free cash flow (TTM) | $50.02M | $30.37M | $152.05M |
| Gross margin (Yahoo) | 44.3% | 52.17% | 97.37% |
| Net margin (computed) | 12.49% | 32.05% | 24.06% |
| Revenue growth (Yahoo, period unstated) | 7.9% | 14.6% | 13.2% |
| Market cap (USD, at 17,905) | $854.33M | $2,342.59M (derived) | $21,817.16M (derived) |
| P/E (recomputed) | 12.28x | 15.79x | 141.78x |
| P/S (recomputed) | 1.53x | 5.06x | 34.11x |
| FCF yield (recomputed) | 5.86% | 1.30% | 0.70% |
| EV/EBIT (FY2025 EBIT, EV rebuilt) | 8.80x | not available in provided data | not available in provided data |
| Yahoo raw P/B, P/S, EV/EBITDA | suppressed (currency mismatch) | suppressed (currency mismatch) | suppressed (currency mismatch) |
| Forward estimates | 1 analyst: revenue $573.0M, EPS $0.005, low = high | not available in provided data | not available in provided data |
| Fiscal year | Revenue | Gross margin | EBIT margin | Capex | Capex % revenue | FCF |
|---|---|---|---|---|---|---|
| 2022 | $550.45M | 49.67% | 25.21% | −$39.11M | 7.10% | $107.45M |
| 2023 | $546.08M | 48.01% | 25.33% | −$30.14M | 5.52% | $124.73M |
| 2024 | $547.02M | 47.14% | 23.59% | −$53.74M | 9.82% | $102.34M |
| 2025 | $553.50M | 43.99% | 21.04% | −$63.35M | 11.45% | $91.91M |
Revenue is flat in USD, so the margin chain is the story: gross margin is down 5.68pp since 2022, capex ran 1.55x its prior three-year mean, and FCF has fallen two years running. Gross margin exceeds EBIT margin in every year, so nothing was discarded and no input moved. BREN's 141.78x P/E is an outlier I do not treat as comparable.
Valuation
| Input | Value | Basis |
|---|---|---|
| Base-year revenue | $553.50M (FY2025) | REPORTED — FY2025 statements |
| Revenue growth, base | 0.18% a year | COMPUTED — FY2022 $550.45M → FY2025 $553.50M, 3-year CAGR |
| Revenue growth, bear / bull | 0% / 5.0% | ASSUMED — bear holds revenue flat; bull sits just under Indonesia's 5.21% annualised real GDP (as of 2026-04-01). The one analyst's +1.6% is not a consensus and is not used |
| Terminal EBIT margin, base | 21.04% | COMPUTED — FY2025, the low end of the 21.04–25.33% four-year range, held flat |
| Terminal EBIT margin, bull | 25.33% | COMPUTED — top of the same range (FY2023), reached linearly over 5 years |
| Terminal EBIT margin, bear | 19.0% | ASSUMED — below the range, because FY2025 alone fell 2.55pp (23.59% → 21.04%) |
| Tax rate | 22.79% | REPORTED — FY2025 effective rate |
| Return on invested capital | 10.16% | COMPUTED — NOPAT $89.92M ÷ ($714.98M book equity + $170.41M net debt); reinvestment = growth ÷ ROIC |
| Net debt | $170.41M | REPORTED — total debt $344.59M less cash $174.18M |
| Cost of equity | 12.77% | ASSUMED — US 10Y 5.27% (2026-10-06) + β 1.0 × 7.5% Indonesia ERP; β 1.0 is a prior because the measured 0.26 (R² 0.077, 473 sessions) is noise |
| Cost of debt | 6.72% pre-tax, 5.19% after tax | COMPUTED — interest $23.15M ÷ debt $344.59M, tax 22.79% |
| Capital weights | 71.3% equity / 28.7% debt | COMPUTED — market cap $854.33M against debt $344.59M |
| WACC | 10.6% (bear 11.6%, bull 9.6%) | ASSUMED — 71.3% × 12.77% + 28.7% × 5.19% = 10.59%, ±1pp across cases; the tool's own WACC is unavailable (no risk-free supplied) |
| Terminal growth | 2.5% | ASSUMED — USD cash flows, and no nominal-GDP ceiling is computable (no usable Indonesia CPI); anchored near US 5y5y inflation of 2.32% (2026-09-11), far below 5.21% real GDP |
| Share count | 15.85bn | COMPUTED — market cap IDR 15.2967tn ÷ price 965 |
| USD/IDR | 17,905 | REPORTED — Macro Snapshot, as of 2026-10-07 |
| Case | Growth | EBIT margin | WACC | Equity value | Per share (USD) | Per share (IDR) | Implied P/E |
|---|---|---|---|---|---|---|---|
| Bear | 0% | 19.0% | 11.6% | $537.6M | $0.0339 | IDR 607 | 7.7x |
| Base | 0.18% | 21.04% | 10.6% | $684.0M | $0.0431 | IDR 773 | 9.8x |
| Bull | 5.0% | 25.33% | 9.6% | $1,005.2M | $0.0634 | IDR 1,135 | 14.5x |
| Peer-relative method | Calculation | Value per share |
|---|---|---|
| PGEO P/E, a ceiling | 15.79x × POWR TTM net income $69.55M = $1,098.2M | IDR 1,240 ($0.0693) |
| BREN P/E | 141.78x | excluded as an outlier |
| POWR's own P/E | 12.28x | IDR 965, the price by construction |
The DCF base and PGEO's P/E ceiling differ by 60%. I weight the DCF: PGEO nets 32.05% of revenue against POWR's 12.49% and does not co-move with it. Beta is unusable; the one analyst's low equals high, so it is not used.
Sensitivity: the discount rate dominates. +1pp of WACC cuts base value 12.6%; the price equals the base DCF at 9.1%, and a shrunk beta of 0.51 (2/3 × 0.26 + 1/3 × 1.0) gives a 7.95% WACC and IDR 1,199, the direction that breaks my thesis. 1pp of EBIT margin moves value 4.9%.
Catalysts & Risks
| Item | Type | Timing | Probability | Impact if it lands |
|---|---|---|---|---|
| Q3 2026 results: margin holds or erodes | Catalyst | Late Oct–Nov 2026 (inferred; no forward date in data) | High that it prints (inferred) | ±4.9% of base value per ±1pp EBIT margin |
| Gross margin and FCF erosion continues; capex step-up forces a distribution cut | Risk | From the Q3 print onward | Medium (four-year trend; inferred) | −21% to base value (bear case) |
| USD/IDR falls or US rates rise | Risk | Any time; USD/IDR 17,905 and US 10Y 5.27% today | Medium (inferred) | −10% if USD/IDR falls 10%; −12.6% per +1pp WACC |
| Interim dividend declared | Catalyst | ~Nov 2026 (inferred from last year's interim, 326 days ago) | High (inferred) | −5% if cut below $23M (inferred) |
| A counterparty confirms direct industrial or data-centre offtake of 100 MW or more | Catalyst | Unscheduled, within 12 months | Low (0 of 1 wire items names POWR) | +10% (inferred; only if returns beat the WACC) |
| Renewable expansion firmed with a named project and offtaker | Catalyst | Unscheduled | Low-Medium (self-claimed, 253.7 days old) | +3% (inferred) |
| Data-centre load stalls on water, permits or the PLN surplus | Risk | Unscheduled | Medium (inferred) | −20% (price converges to base; inferred) |
| FY2026 results and final dividend | Catalyst | Q1–Q2 2027 (inferred; last final reported 152 days ago) | High | +21% to base value if EBIT margin is 25.3% or higher |
Impacts are signed against base value and come from this memo's model; probabilities are my judgement.
Business Model & Theme Involvement
POWR burns gas and coal in 1,144 MW of plants, adds 35.8 MWp of rooftop solar, and sends power over its own 150 kV and 20 kV lines to industrial customers.
By my reading, revenue is recurring metered electricity sold to industrial users (the profile states no tariff), so gross margin is a tariff-over-cost spread. Revenue is flat while gross margin fell from 49.67% to 43.99%: the mechanism holds on volume and erodes on spread. PLN's share of sales is not available.
Claims: this run's ladder reads SELF_CLAIMED ×1, and 0 of 1 items have the other side naming POWR; that item is about dividends and renewables. The data-centre link here is one word in the profile's customer list. The 2026-10-03 scout report records PDG naming POWR for a 30 MW campus since August 2023: COUNTERPARTY_NAMED, three years old, at most 2.6% of installed capacity, tariff undisclosed. Accounts: power-layer test SILENT. Gross margin of 44.0% sits inside the 20–60% band; capex intensity of 11.4% is 18.6pp under the 30–400% floor, which I read as a mature operator, not a builder.
Future projects: no recognised project type named in these items, a vocabulary ceiling, not "none planned".
| Claim | Who is on the record | Tier | Age | What would advance it |
|---|---|---|---|---|
| Supplies a 30 MW Cibitung data-centre campus (20% biomass plus IRECs) | PDG, per the 2026-10-03 scout report (not in this run's wire; not re-verified) | COUNTERPARTY_NAMED | About 3.2 years (consuming since Aug 2023) | MW, term and tariff disclosed in POWR's filings (CONTRACTED), then a revenue line (IN_ACCOUNTS) |
| Serves "data center" customers | POWR's own profile text | SELF_CLAIMED (my reading; not scored by the ladder) | Undated | A tenant naming POWR with MW and tariff |
| Renewable-energy expansion | POWR, via InvestorTrust | SELF_CLAIMED | 253.7 days | Named project, capex and offtaker |
| Net profit +18% CAGR 2025–2027 | POWR projection, via SuaraGarut.ID | SELF_CLAIMED (my reading; not scored by the ladder) | 24 days | FY2026 print showing margin recovery |
Business & Flow
No segments could be parsed from the description, and the percentage split is not available: yfinance exposes no segment data for .JK and filed splits sit in IDX PDFs nothing here reads. I do not estimate a mix. The consolidated trend is in The Numbers.
The wire is thin, not quiet: one development item, 253.7 days old, none in the last 90 days. Absence is not evidence of absence. No items were excluded as ticker collisions; every kept item names POWR or Cikarang Listrindo.
| Development | Type | Age | Why it matters |
|---|---|---|---|
| InvestorTrust: POWR interim dividend and renewable-energy expansion | Expansion | 253.7 days | The only development item; the company speaking, no counterparty |
| SuaraGarut.ID: POWR projects net profit +18% CAGR 2025–2027 | Reported result | 24 days | Press-reported projection; needs margin recovery against falling margins |
| IDX Channel, KONTAN, Bisnis.com: final dividend $45.2M, Rp49.52 a share | Dividend | 147–152 days | Scale of distribution against TTM free cash flow |
| IDNFinancials: profit down 21%, $23M interim dividend kept | Dividend | 326 days | Press-reported; the period of the fall is not stated |
Of eight sector headlines, none concerns Indonesian industrial power demand or tariffs; Kontan's renewable-issuer outlook is the closest. Bisnis.com's quarter wrap puts energy among Q3's leaders, so the price strength looks like sector tide, not company news (inferred).
The tape: price is 9.5% above the 50-day SMA (881.6) and 31.6% above the 200-day (733.13), an uptrend on both horizons; those are the nearest supports, and resistance is not available in provided data. RSI 55.16, MFI 41.97 and relative volume z −0.79 are mixed, and the accumulation/distribution slope z +0.64 leans mildly to accumulation. Technicals conflict with my cautious thesis on trend and are neutral on flow.
Macro
Policy-rate data is unavailable (no FRED key), so I infer no stance. Indonesia's latest CPI print, 1.9% as of 2025-04-01, is about 18 months stale and unusable. Real GDP grew 1.28% quarter on quarter (dated 2026-04-01; 5.21% annualised), supportive of industrial power demand, but the next print is not in.
Revenue and debt are USD, so IDR value moves one-for-one with USD/IDR: 10% higher lifts the base case to IDR 850, 10% lower cuts it to 695 (computed). The US 10Y at 5.27% (2026-10-06) sets the risk-free leg of the discount rate. Interest cover is 5.0x FY2025 EBIT; fixed versus floating debt is not available.
Gas and coal input costs, and the tariff they feed, are not in the snapshot; crude ($89.97) is no proxy for either, so margin erosion cannot be tied to fuel. That caps conviction.
Method & Caveats
Peers PGEO and BREN were fixed in the pre-built context (gathered 2026-10-07 07:53 local), not chosen by me, and cannot be re-peered; their partial correlations with POWR are near zero, so the comparison is business-model only.
Conversion: USD/IDR 17,905 (Macro Snapshot, 2026-10-07). Validated: market cap IDR 15.2967tn ÷ 17,905 = $854.3M, matching the block's $854,325,437. Any over- or undervalued reading holds only at that rate and the assumed WACC. Peer market caps are Yahoo's raw P/S × USD revenue ÷ 17,905, an identity confirmed on POWR only. Yahoo's EV does not reconcile and D&A is absent, so EV/EBIT replaces EV/EBITDA. Yahoo's 12.81 P/E is 4% above my 12.28.
Absent: segment split, tariff, PLN share, fuel costs, policy rate, a tool-computed WACC. Analyst coverage: 1. TTM FCF ($50.02M) against the DCF's year-one $88.5M is unreconciled; capitalising TTM FCF at 12.77% gives $499M, below market cap. No field was discarded. I had no web tool: the Jatiluhur halt (reported 30 Sep–3 Oct) and the 6 GW surplus (scope unstated) rest on repo records.