Research · 2026-10-07
KIJA
KIJA sells land in its Bekasi/Cikarang industrial estates and runs their power, water and wastewater services, plus golf and hotels (five reported segments).
Low-conviction starter long on cash durability at a price near the flat-cash DCF value, but not a data-centre trade, since no buyer has confirmed land demand and the 57% recurring-utility mix behind the better-toll argument could not be verified.
Base case: Overweight
Thesis
The market treats KIJA's cash as a one-off, and it is half right. Free cash flow exceeded EBIT in FY2024 and FY2025, reaching 161% of it in FY2025. With depreciation unavailable, that points to customer money arriving ahead of cost, so the 2.20tn IDR FY2025 figure is not a run-rate and the 25 August memo's "mid-cycle cash" was too generous.
What remains is the trailing cash flow, which the price now capitalises with almost no growth. The 25 August "cheap on assets" claim also falls: KIJA's book multiple is a premium to BSDE and CTRA, so the case is cash, not assets.
The upside option is the recurring electricity-and-water share that the 2026-09-05 /scout report puts at 57% of revenue, which would make KIJA a toll billing the load continuously. I could not verify it, so it is an option, not an input. This is not a data-centre trade: nobody on the other side has named a buyer.
Hypothetically a 0.5% starter in a $100M fund, an analytical exercise, not a recommendation.
What's Priced In
At 163 the price capitalises the trailing 570.74bn IDR of free cash flow at an implied 17.56% (570.74 × 1.04 ÷ 4,377.58bn rebuilt EV, plus 4% growth); in August the same cash at 206 implied 15.26%. The market is paying for no cash growth. This thesis believes underlying cash is at least the 651.17bn that EBIT less interest, tax and capex produces before any depreciation add-back, and that a recurring utility block, if it exists, makes cash stickier than land sales. The second belief is unverified.
What breaks it fastest: FY2026 free cash flow below the trailing 570.74bn at the FY2026 results (~March 2027). On that print the flat-cash blend of 127 IDR becomes the anchor, 22% below today's price.
The Numbers
All three report and quote in IDR, so no conversion was needed. The trailing statement figures are identical to 25 August; only price-derived rows moved. The margin chain is valid in all four years (gross margin above EBIT margin), so nothing was discarded and the terminal-margin bracket stands. FCF ÷ EBIT above 100% in FY2024–25 is what carried those years.
| Trailing metric | KIJA now | KIJA 25 Aug | BSDE | CTRA |
|---|---|---|---|---|
| Reporting / quote currency | IDR / IDR | IDR / IDR | IDR / IDR | IDR / IDR |
| Price | 163.00 IDR | 206.00 IDR | not available in provided data | not available in provided data |
| Revenue | 4,859.49bn IDR | 4,859.49bn IDR | 11,149.35bn IDR | 11,928.89bn IDR |
| Net income | −65.34bn IDR | −65.34bn IDR | 1,861.23bn IDR | 2,524.83bn IDR |
| Free cash flow | 570.74bn IDR | 570.74bn IDR | −4,839.56bn IDR | −768.17bn IDR |
| Gross margin | 35.95% | 35.95% | 62.64% | 47.28% |
| P/E | n/m (TTM loss) | n/m (TTM loss) | 6.07x | 3.97x |
| P/B | 0.54x (computed) | 0.68x (computed) | 0.26x | 0.41x |
| P/S | 0.70x | 0.88x | 1.03x | 0.85x |
| EV/EBIT | 3.22x (EV rebuilt) | 3.87x (EV rebuilt) | not available in provided data | not available in provided data |
| Revenue growth (Yahoo, basis unstated) | −13.3% | −13.3% | −35.4% | −16.3% |
| Forward estimates | none, 0 analysts | none, 0 analysts | not available in provided data | not available in provided data |
| Fiscal year | Revenue | Gross margin | EBIT margin | Capex | FCF | FCF ÷ EBIT |
|---|---|---|---|---|---|---|
| 2022 | 2,747.19bn IDR | 51.95% | 17.38% | −275.43bn IDR | 379.24bn IDR | 79% |
| 2023 | 3,299.60bn IDR | 46.56% | 28.42% | −187.20bn IDR | 376.97bn IDR | 40% |
| 2024 | 4,602.65bn IDR | 42.74% | 25.82% | −342.01bn IDR | 1,528.02bn IDR | 129% |
| 2025 | 5,149.43bn IDR | 39.48% | 26.44% | −205.97bn IDR | 2,196.48bn IDR | 161% |
Does the data support ~57% recurring, and is that half growing?
| Test | Result | Reading |
|---|---|---|
| Reported segment split | not available in provided data; no wire headline carries a segment figure | 57% can be neither confirmed nor refuted here |
| Source of the 57% | one place in the repo: SCOUT 2026-09-05, no outlet, filing or date cited | an unattributed claim, carried as such |
| Gross margin vs land peers | KIJA 39.48% (FY2025) vs BEST 61.88%, DMAS 68.47% (25 Aug) | if 57% were recurring, that block would earn 17.6–22.6% gross; plausible for metered resale, but other shares fit as well |
| Direction of gross margin | 51.95% → 39.48%, four straight declines | fits a rising metered share or a falling land margin; cannot separate them |
| Revenue level | TTM 4,859.49bn vs FY2025 5,149.43bn, −5.63% | with 57% metered (2,935.17bn) held flat, land sales would have fallen 13.1%; which half moved is unknown |
| Is the recurring half growing? | not available in provided data | open |
Valuation
| DCF input | Value | Basis |
|---|---|---|
| FCF base, bear / bull | 570.74bn / 1,120.18bn IDR | COMPUTED — bear is trailing FCF; bull is the 4y mean (379.24 + 376.97 + 1,528.02 + 2,196.48) ÷ 4 |
| FCF base, base case | 845.46bn IDR | ASSUMED — midpoint of the two, unchanged from 25 Aug; reconciles to the cross-check below only if D&A is ~194bn (845.46 − 651.17), which is not in the data |
| Earnings-based FCF cross-check | 651.17bn IDR | COMPUTED — (EBIT 1,361.51bn − interest 399.95bn) × (1 − 10.86% tax) − capex 205.97bn; no D&A add-back |
| Growth, 5y | 0% / 5% / 8% | ASSUMED — well below the 23.3% 3y CAGR (FY2022 2,747.19bn → FY2025 5,149.43bn), since TTM revenue is 5.63% under FY2025 |
| Terminal EBIT margin (cross-check) | 22.90% | COMPUTED — midpoint of the observed 17.38–28.42% FY2022–25 range |
| Capex intensity | 4.00% (4y mean 6.78%) | REPORTED — FY2025 205.97bn ÷ 5,149.43bn; capex_latest_vs_prior_mean_x 0.77, so the turn assumes no step-up |
| Discount rate | 15.0% | ASSUMED — no risk-free supplied so no WACC; beta 1.008 on r² 0.131 is weak evidence. Held at the 25 Aug rate so the price move is not confounded with a rate change |
| Terminal growth | 2.0% / 3.0% / 3.5% | ASSUMED — real GDP 5.21% annualised (as of 2026-04-01) bounds it; no CPI print after 2025-04-01, so no nominal ceiling |
| Net debt | 987.69bn IDR | REPORTED — FY2025: 4,606.52bn debt less 3,618.83bn cash |
| Shares | 20.797bn | COMPUTED — market cap 3,389.88bn ÷ 163.00 |
| Method | Bear | Base | Bull |
|---|---|---|---|
| DCF at 15.0% | 152 IDR | 330 IDR | 531 IDR |
| Peer P/B × 301.18 IDR book per share (6,263.55bn equity) | 77 IDR (BSDE 0.257x, fresh) | 102 IDR (median of four, 0.338x; BSDE 0.257x and CTRA 0.412x fresh, BEST 0.264x carried) | 367 IDR (DMAS 1.218x, carried from 25 Aug) |
| Blend (50/50) | 114 IDR | 216 IDR | 449 IDR |
The methods disagree 3.2x at the base because book has no earnings behind it: trailing ROE is −1.04% (−65.34bn on 6,263.55bn) against 4.2% and 10.4% implied for BSDE and CTRA (P/B ÷ P/E). The DCF carries the case; the peer leg is a floor check. The base fell from 277 to 216 IDR only because that leg now includes BSDE and CTRA.
Sensitivity: base-year FCF dominates. At the 651.17bn cross-check the DCF base is 243 IDR and the blend 173, about +6% on price: no edge. At flat trailing FCF the blend is 127 IDR, −22%.
Catalysts & Risks
Probabilities are my judgement, not measured frequencies. (inferred) marks impacts the data does not evidence. The West Java row rests on the 2026-10-03 halt as relayed in the research request; this run's wire does not carry it.
| Item | Type | Timing | Probability | Impact if it lands |
|---|---|---|---|---|
| Q3-2026 print returning to net profit after the H1 loss KabarBursa put at Rp6.4bn (60d) | Catalyst | ~late Oct 2026 | Medium | +12% (inferred) |
| 140-ha H2-2026 industrial-land pipeline converting to sales (Bisnis.com, 60d) | Catalyst | Oct–Dec 2026 | Medium | +15% (inferred) |
| Jababeka Bizpark Phase II meeting its end-2026 completion target (kontan, 312d, stale) | Catalyst | Q4 2026 | Low | +8% (inferred) |
| West Java halted BDx's 640 MW Jatiluhur build on 2026-10-03 over a missing AMDAL and PBG and a 384 L/s water draw; the same permit and water scrutiny reaching Bekasi data-centre land, and KIJA's own water sales | Risk | 0–6 months | Medium | −8% (inferred) |
| A named data-centre operator contracting Cikarang land at scale (none on the record) | Catalyst | 0–12 months, undated | Low | +20% (inferred) |
| US 10Y at 5.31% (as of 2026-10-05) keeping rupiah funding costs high, pressuring refinancing and buyer credit | Risk | 0–12 months | Medium | −12% (inferred) |
| FY2026 FCF below the trailing 570.74bn, confirming a working-capital release | Risk | FY2026 print, ~Mar 2027 | Medium | −22% |
| Kendal Phase II with Sembcorp and the +500 ha addition reaching land sales (Industry.co.id 144d; KONTAN 1d) | Catalyst | H1 2027 | Low | +10% (inferred) |
Business Model & Theme Involvement
What it does. KIJA sells land in its Bekasi/Cikarang industrial estates and runs their power, water and wastewater services, plus golf and hotels (five reported segments).
How it makes money. Land is a one-shot sale priced before the buyer's economics are known; electricity and water are metered and bill the tenant's load continuously. The 2026-09-05 /scout report puts the metered part at 57% of revenue, Bekasi Power on a 20-year, 130 MW contract. Neither is verified: the 57% appears once in this repo with no outlet, filing or date, and the segment split is unavailable. The 39.48% gross margin is consistent with a large metered block but fits other shares equally; it has fallen four years running, so the gross line is eroding.
Theme involvement. Tier SELF_CLAIMED: of 14 wire items, 12 are KIJA on itself, 2 are RUMOURED, none has the other side naming it. None names a data-centre project. The estate signature test is SILENT: gross margin 39.5% sits inside the 30–70% band, capex intensity 4.0% below the 10% floor. Claim and accounts stay separate findings.
Future projects. The only project type recognised is "property", a ceiling on the vocabulary, not proof nothing else is planned.
| Claim | Who is on the record | Tier | Age | What would advance it |
|---|---|---|---|---|
| ~57% of revenue is recurring electricity and water; Bekasi Power 130 MW, 20-year contract | The 2026-09-05 /scout report, no outlet or filing cited; Emitennews "recurring income dominates", no figure (via the 25 Aug memo) | Unattributed; not scored by the ladder | 32d; ~48d | The filed segment note (IN_ACCOUNTS), or a PLN or tenant statement |
| Seafer 51% acquisition, Central Java | KIJA group (Bisnis.com) | SELF_CLAIMED | 2d | Seller or regulator filing with price, funding and closing date |
| +500 ha at Kendal; Phase II with Sembcorp | KIJA (KONTAN 1d; Industry.co.id 144d) | SELF_CLAIMED (my reading) | 1d / 144d | Sembcorp or a named tenant confirming; land sales booked |
| Jababeka Bizpark Phase II, end-2026 completion | KIJA (kontan) | SELF_CLAIMED (my reading) | 312d | Completion notice or named tenants |
| Data-centre land sale at Cikarang | Nobody; /scout: no at-scale sale as of June 2026 | Not on the record | n/a | A named operator contracting hectares (COUNTERPARTY_NAMED), then a signed, sized agreement (CONTRACTED) |
Business & Flow
Where the money comes from. Five reported segments: Real Estate, Golf, Service and Maintenance, Power Plant, Tourism. The percentage split is not available: yfinance exposes no segment data for .JK, the filed split sits in IDX e-reporting PDFs nothing here reads, and no headline carries a segment figure. Revenue rose 87.44% over FY2022–25 while gross margin fell 12.47pp and EBIT margin rose 9.06pp: margin compresses as it scales and the offset sits below the gross line.
| Development | Type | Age | Why it matters |
|---|---|---|---|
| Seafer 51% stake, Central Java (Bisnis.com) | Expansion | 2d | New since 25 Aug. Price, funding and closing are not in the wire |
| +500 ha of land at Kendal (KONTAN, forward outlook) | Land bank | 1d | New. Enlarges the saleable bank; no sales evidence attached |
| H1-2026 loss of Rp6.4bn, "pressed by refinancing costs" (KabarBursa) | Reported result | 60d | A press figure; a finance cost would sit below EBIT (inferred) |
| 140-ha industrial-land pipeline for H2-2026 (Bisnis.com) | Pipeline | 60d | A pipeline is intent, not a sale |
| Rp1.2tn BRI loan for Kendal expansion (kontan, Bisnis, Emitennews, RCTI+, InvestorTrust) | Capex funding | 134d | One event across five outlets; post-dates the FY2025 net debt of 987.69bn |
| KEK Kendal Phase II with Sembcorp (Industry.co.id) | Expansion | 144d | Partner-funded leg; Sembcorp itself is not quoted |
| Jababeka Bizpark Phase II groundbreaking, end-2026 target (kontan) | Capacity | 312d | Stale; completion falls inside the horizon |
| Bekasi industrial-land scarcity favouring KIJA and SSIA (KONTAN) | Sector | 226d | A third-party pricing-power claim; no price series to test it |
What is changing. One of 15 wire items was excluded as a name collision, and the Sultan Group Tanzania item (60.8d) is a tenant's news. Sector news returned eight items and none concerns industrial land: seven are off-market (Saudi, GCC, Vietnam, regional GDP) and one is residential credit. Share gain versus tide cannot be judged from this wire.
The tape. Price is 3.68% below the SMA50 (169.22) and 9.17% below the SMA200 (179.46), with the SMA50 5.71% below the SMA200: an unbroken downtrend, with the August blow-off unwound (RSI 43.96 against 80.08; MFI 50.87 against 96.80). The accumulation slope is flat (z −0.064 against −3.634) on below-average volume (z −1.37). Resistance sits at the two averages; no support level is available in the data. Technicals are neutral to the thesis.
Macro
Policy rates are unavailable (no FRED_API_KEY), so I make no claim about Bank Indonesia's stance. Indonesia's CPI print is 1.9% dated 2025-04-01, 18 months stale; real GDP grew 5.21% annualised as of 2026-04-01. USD/IDR is 17,912 (2026-10-06) and the US 10Y 5.31% (2026-10-05).
KIJA's 4,606.52bn IDR of debt carries an implied 8.68% cost, so each 100bp on a fully floating stack would cost 46.07bn; the fixed/floating and currency mix are not in the data. Land demand is tenant capex, which responds to rate and rupiah levels with a lag.
Commodity coverage is absent: the Power Plant's fuel input and tariff pass-through are not in the snapshot, crude ($89.78) is not a proxy for gas or coal, and no industrial-land price series exists. That caps conviction on the recurring-income leg.
Method & Caveats
Timing. Context gathered 2026-10-06, one day before this memo's date; 163.00 is that run's last close. This supersedes KIJA_2026-08-25: statements, DCF and discount rate unchanged, price −20.9% from 206, peer leg widened, stance moved from watch to starter because the tape no longer conflicts.
Multiples. Yahoo's EV implies 3,346.79bn of net debt against 987.69bn on the balance sheet (reconciles: False). I discarded its 5.6x EV/EBITDA, rebuilt EV at 4,377.58bn, and quote EV/EBIT on FY2025 EBIT since TTM EBIT is absent. P/B is recomputed at 0.54x (Yahoo: 0.56x). Everything is IDR.
Absent. Segment split; D&A; risk-free rate; policy rates; current CPI; land prices; a DMAS/BEST refresh. Analysts: 0, measured. Beta 1.008 on r² 0.131 is weak. No margin-chain year failed, so nothing was discarded.
Signature. The 2026-09-11 scout run recorded KIJA as CORROBORATES; this run returns SILENT on capex intensity. I did not establish why. BSDE and CTRA co-move with KIJA at partial +0.047 each once IHSG is removed, so the peer set rests on business argument alone.